A defined reference can support position/orientation verification, support-point and interface checks, and pre-lift and post-lift geometry records. The survey plan should define control stability, target coordinates, observation times and hold points.
Movement, elevation or inclination observations during transport, lifting or load-out are conditional on the agreed method, access and confirmed instrumentation. Do not infer continuous real-time monitoring, acoustic positioning, load measurement or dynamic positioning control from a general dimensional survey scope.
Dimensional survey evidence is separate from marine engineering, lifting engineering, structural certification, stability approval and operational control. The responsible engineering and operation teams decide whether movement can proceed.