
Complete Piping Solutions from Design to Installation
Fabrication of piping spools, double-wall and dual-fuel piping and prefab pipe modules at vetted Chinese shops, with hold-point inspection and traceability.
Advanced modular construction with modules up to 6,000 tonnes, fabricated in controlled factory environments for superior quality
Early construction planning feedback to design phase, enabling parallel execution and optimized construction sequences
Integrated engineering, procurement, and construction approach with overlapping task durations for accelerated delivery
Heavy-lift ships, SPMTs, and specialized logistics for safe transport of pre-fabricated mega-modules
Our piping systems division delivers design, fabrication and installation solutions for refineries, chemical plants, power generation, and industrial facilities. We specialize in complex piping systems, process modules, fluid handling infrastructure, and integrated modular systems for industrial applications.
ISO 55000 Asset Management with predictive maintenance excellence standards

Design and fabricate complex high-pressure piping networks for new petrochemical facility with stringent safety and environmental requirements
Advanced stress analysis, specialized alloy fabrication, comprehensive pre-fabrication, and innovative modular installation techniques
Design & fabrication of modular process skids, piping spools, pressure vessels/heat exchangers, and offshore/topsides modules
½″–60″ (DN15–DN1500)
1,200 piping spools (CS/SS), ASME B31.3 compliant
PAUT/RT inspection, staged export in 5 lots
Duplex seawater piping spools with LR documentation
Shop hydrostatic testing with pickling/passivation
Yes—full traceability including WPS/PQR, ITP, NDT reports, hydrotest certificates, and MDR/DoC per contract requirements.
VT, MT, PT, and UT/PAUT are performed in-house. RT (Radiographic Testing) is conducted via approved third-party partners.
Yes—we have qualified procedures for exotic materials including ferrite checks and PWHT (Post-Weld Heat Treatment) where specified.
Drawings (P&IDs/isometrics/GA), Material Take-Off (MTO), applicable codes/class requirements, material specifications, NDT scope, target delivery date, and destination port.
Piping spools: 6–10 weeks after PO. Modular skids: 8–14 weeks (subject to BOM availability, long-lead items, and drawing approvals).
Ready to start your project? Submit a detailed RFQ to receive a comprehensive proposal tailored to your specific requirements.