Complete Offshore Platform & Marine Vessel Fabrication
Fabrication of FSO/FPSO and topside modules, subsea structures and special vessel packages at vetted Chinese yards, with resident inspection and class records.
For ship-hull and dry-dock surface preparation, Meritus also provides embodyne.ai magnetic crawler robots; explore the magnetic crawler robot applications.
Standardized pre-engineered modules fabricated in controlled environments for enhanced quality, reduced site labor, and accelerated project delivery
Comprehensive digital twins, plant operator simulators, and 4D material systems for enhanced project execution and future operations
Integrated ECI approach combining engineering, procurement, and construction expertise from concept through commissioning
Electrified designs and clean technology integration reducing greenhouse gas emissions while maintaining operational excellence
Our offshore and marine division delivers turnkey fabrication and assembly solutions for deepwater energy projects and marine transportation. With multiple strategic fabrication yards and advanced facilities, we specialize in FSO, FPSO, FLNG platforms, topside modules, jacket structures, and specialized vessels for offshore operations.
ISO 9001:2015 with specialized environmental and energy management standards

Fabricate and install 45,000-ton offshore production platform in harsh North Sea environment with strict environmental and safety requirements
Advanced heavy fabrication facility with specialized lifting equipment, modular construction approach, and innovative float-out installation method
Design & fabrication of modular process skids, piping spools, pressure vessels/heat exchangers, and offshore/topsides modules
Duplex seawater piping spools with LR documentation
Shop hydrostatic testing with pickling/passivation treatment
Yes—full traceability including WPS/PQR, ITP, NDT reports, hydrotest certificates, and MDR/DoC per contract requirements.
VT, MT, PT, and UT/PAUT are performed in-house. RT (Radiographic Testing) is conducted via approved third-party partners.
Yes—we have qualified procedures for exotic materials including ferrite checks and PWHT (Post-Weld Heat Treatment) where specified.
Drawings (P&IDs/isometrics/GA), Material Take-Off (MTO), applicable codes/class requirements, material specifications, NDT scope, target delivery date, and destination port.
Piping spools: 6–10 weeks after PO. Modular skids: 8–14 weeks (subject to BOM availability, long-lead items, and drawing approvals).
Ready to start your project? Submit a detailed RFQ to receive a comprehensive proposal tailored to your specific requirements.