Meritus Technology / China project support

China Fabrication Project Support

Meritus Technology has an in-house technical team, equipment and software capability for projects across fabrication yards and suppliers in China. We coordinate survey work with your project team’s access, inspection and reporting requirements.

Illustrated fabrication-yard personnel wearing branded workwear, not actual Meritus staff
Illustrative fabrication-yard coordination in China. The people shown are not actual Meritus staff.

A practical link between the yard and your project team

For an agreed assignment, Meritus performs dimensional capture and analysis within the defined survey scope. Technical inspection and supervision focus on specified fabrication activities, records and observations; responsibilities are established before mobilisation.

We can coordinate inspection/test-plan hold points, yard access, drawing availability and reporting interfaces. Where an assignment is to witness a test, the qualified testing party remains responsible for performing it. Supplier/project audits follow agreed criteria and do not create a certification claim.

Mobilisation across China is planned around the asset, yard permissions, programme, language and technical competencies needed. Agree suitable personnel and any required evidence of qualification rather than assuming every specialist activity is covered.

  • Technical inspection and supervision at fabrication sites
  • ITP review, hold-point coordination and witness scheduling
  • Supplier/project audits against agreed criteria
  • Progress and quality reporting with open-item tracking
  • Mobilisation of suitable technical personnel across China
Survey inputs, datum, capture, comparison and report workflowExplanatory schematic only. No project measurement, tolerance or performance result is represented.12345ILLUSTRATIVE GEOMETRY / NOT MEASURED DATAReference and acceptance criteria agreed per project
Illustrative work-package route: brief, yard access, survey/inspection, reporting and project disposition.

An agreed, traceable workflow

How the work is planned and delivered

  1. Define the asset, yard location, work package, project stage and schedule.
  2. Agree technical responsibilities, required competencies, access and drawing revisions.
  3. Coordinate inspection plans, survey control and hold points with the yard and EPC team.
  4. Perform the agreed survey or inspection assignment; witness or coordinate separate activities as specified.
  5. Issue reporting, track open items and agree any follow-up visit or re-survey.
Survey inputs, datum, capture, comparison and report workflowExplanatory schematic only. No project measurement, tolerance or performance result is represented.12345ILLUSTRATIVE GEOMETRY / NOT MEASURED DATAReference and acceptance criteria agreed per project
Illustrative work-package sequence. Method, hold points and reporting are agreed before capture.

Acceptance criteria come from the client’s approved drawings, specifications and agreed survey plan. There is no universal tolerance or automatic acceptance based on the instrument used.

Practical handover

Typical outputs

Select the deliverables your engineering and QA teams can use. Formats, coordinate conventions, revision references and limitations are part of the agreed scope.

  • Agreed scope and mobilisation plan
  • Survey, inspection or witness records according to assignment
  • Progress/quality reports and open-item registers
  • Supplier or project audit observations against agreed criteria
Coordinate records, annotated views and engineering reviewExplanatory schematic only. No project measurement, tolerance or performance result is represented.ILLUSTRATIVE GEOMETRY / NOT MEASURED DATAReference and acceptance criteria agreed per project
Illustrative coordinate record, annotated comparison and review pack. These are not sample project findings.

Application use cases / not project case studies

Engineering situations and the decisions they support

The following typical situations explain a survey approach. They are not claims that Meritus completed a named project. Each assignment uses the client’s approved drawings, specifications and project-specific acceptance criteria.

FPU/FPSO topside module fabrication and fit-up

Asset and fabrication stage
Separately fabricated topside modules before trial fit, lift or integration at the yard.
Dimensional problem
Structural connections and piping interfaces can be individually complete but fail to align when the modules are brought together.
Survey reference and capture method
Establish a survey control network and shared datum; capture critical interfaces, mating surfaces and support positions with total stations and/or scanning.
Analysis against design and tolerance
Transform as-built geometry to design coordinates; compare connection positions and clearances against current approved drawings and project tolerances.
Deliverables
Interface coordinate tables, annotated deviations, clash/fit-up views and a corrective-action list for engineering disposition.
Engineering decision supported
Whether to adjust a connection or module before integration, or request further engineering review.
Industrial module interface and fit-up illustration
Illustrative module interfaces and fit-up coordination, not a documented project or measured result.
Discuss module interfaces before integration

Offshore wind suction caissons and jackets during yard fabrication

Asset and fabrication stage
Cylindrical foundation and lattice structures at agreed fabrication hold points, before release or installation planning.
Dimensional problem
Roundness, verticality, straightness, flatness or interface geometry can change during fabrication.
Survey reference and capture method
Establish a measured control network; capture selected sections and interfaces with scanning and/or total stations relative to stable benchmarks.
Analysis against design and tolerance
Compare as-built profiles, axes and mating surfaces with design geometry and the tolerances specified for the current stage and measurement condition.
Deliverables
Circularity/ovality and verticality reports, deviation maps, interface records and as-built geometry for installation planning.
Engineering decision supported
Release, correction or further engineering review against the governing project tolerance.
Schematic of caisson circular sections, jacket legs and flange interfaceExplanatory schematic only. No project measurement, tolerance or performance result is represented.ILLUSTRATIVE GEOMETRY / NOT MEASURED DATAReference and acceptance criteria agreed per project
Illustrative cylindrical foundation profiles and jacket geometry; candidate yard photographs are not yet approved.
Discuss foundation geometry and hold points

As-built capture and reverse engineering of existing assets

Asset and fabrication stage
Existing structures or equipment before a modification, tie-in or replacement design.
Dimensional problem
Incomplete or outdated drawings leave uncertainty about actual geometry, clearances and connection locations.
Survey reference and capture method
Scan or survey accessible geometry against agreed control, register the data and verify critical dimensions before design use.
Analysis against design and tolerance
Compare selected geometry with available drawings; distinguish measured surfaces from inferred model elements and record coverage and uncertainty limitations.
Deliverables
Registered point cloud, selected measured model/drawings, tie-in dimensions and uncertainty/coverage notes.
Engineering decision supported
How to plan modifications against the actual asset, and which inaccessible or critical features need further verification.
Industrial laser-scanning illustration showing survey capture around fabricated structures
Illustrative laser-scanning and geometry capture concept, not a Meritus project dataset.
Discuss as-built inputs for a modification

Before you scope a survey

Buyer questions

Survey datum axes, alignment and interface geometryExplanatory schematic only. No project measurement, tolerance or performance result is represented.ILLUSTRATIVE GEOMETRY / NOT MEASURED DATAReference and acceptance criteria agreed per project
Illustrative scope reminder: agree the reference, required evidence and responsible decision-maker.
What can a survey team cover across multiple Chinese yards?

A coordinated scope can use consistent coordinate conventions, reporting formats and hold-point requirements across work packages. Access, travel, control transfer and the competencies required at each yard need individual planning.

What should an EPC team send before mobilisation?

Asset type, yard location, drawing/model availability and revision, critical tolerances, inspection/test plan, project stage and schedule. Include site-access restrictions and the engineering decision the survey must support.

Does supervision transfer responsibility for the fabrication?

No. Supervision or witnessing records agreed observations. Fabrication responsibility, engineering authority and client acceptance remain as defined by the project contracts and inspection plan.

Can you provide technical personnel for an inspection assignment?

Suitable technical personnel can be mobilised across China within an agreed scope. Confirm the discipline, required qualifications, duties, duration and availability for the specific assignment.

Are supplier audits a certification service?

No certification is implied. Audit criteria, evidence, coverage and reporting are agreed with the client, and findings are issued for the client’s supplier or project decisions.

Start with the engineering question

Plan a China yard assignment

Tell us what must connect, what is already fabricated and when your team needs measured evidence. Use our existing contact flow to discuss the survey scope; there is no new survey submission form.

Include in your survey brief

  • Asset type and interfaces that matter
  • Site/yard location and access restrictions
  • Available drawings/models and revisions
  • Critical dimensions and governing tolerances
  • Fabrication or installation stage
  • Schedule, hold points and required outputs

Share confidential files through an agreed project channel, not a public page.