Advanced Cargo Handling & Fuel Gas Supply Solutions
Sourcing and fabrication of LNG/LPG Type C tanks, cargo handling, fuel gas supply and reliquefaction units from vetted Chinese shops, inspected at hold points.
Type C tank fabrication from 2,000m³ to 175,000m³ using specialized nickel steel and advanced welding techniques
Complete cargo handling and fuel gas supply system integration with advanced automation control
Handling multiple cargo categories including LNG, LPG, LEG, ethane, methanol, and ammonia
Extensive experience with over 40 liquefied gas carriers and comprehensive commissioning support
Our LNG/LPG systems division delivers complete engineering, fabrication and installation solutions for energy companies and marine operators worldwide. We specialize in processing trains, storage tanks, cargo handling systems (CHS), fuel gas supply systems (FGSS), and advanced automation control systems for facilities ranging from 2,000m³ to 175,000m³ capacity.
ISO 9001:2015 Quality Management System with project-specific Quality Assurance Programs

Design and fabricate complete 6.2 MTPA LNG processing train with advanced modular construction approach for accelerated offshore installation
Modular fabrication strategy with 85% factory construction, advanced pre-commissioning, digital twin integration, and specialized heavy-lift installation techniques
Large-scale petrochemical facility requiring coordination of multiple process units, utilities, and stringent safety requirements in high-risk environment
Integrated engineering approach with 3D modeling, advanced project controls, comprehensive safety management, and extensive local workforce development with international best practices
Integrated solar-wind-storage facility with grid connection requiring advanced energy management and local content requirements
Hybrid renewable energy design with advanced SCADA systems, battery storage integration, smart grid technology, and comprehensive local supply chain development
Design & fabrication of modular process skids, piping spools, pressure vessels/heat exchangers, and offshore/topsides modules
Metering skid with AGA compliance
Complete FAT testing and export packing for international shipment
Yes—full traceability including WPS/PQR, ITP, NDT reports, hydrotest certificates, and MDR/DoC per contract requirements.
VT, MT, PT, and UT/PAUT are performed in-house. RT (Radiographic Testing) is conducted via approved third-party partners.
Yes—we have qualified procedures for exotic materials including ferrite checks and PWHT (Post-Weld Heat Treatment) where specified.
Drawings (P&IDs/isometrics/GA), Material Take-Off (MTO), applicable codes/class requirements, material specifications, NDT scope, target delivery date, and destination port.
Piping spools: 6–10 weeks after PO. Modular skids: 8–14 weeks (subject to BOM availability, long-lead items, and drawing approvals).
Ready to start your project? Submit a detailed RFQ to receive a comprehensive proposal tailored to your specific requirements.