Floating offshore wind moves the industry into water too deep for fixed foundations, and into a structure that behaves like a vessel rather than a tower. Serial production is the whole economic argument — which makes repeatable fabrication quality, not one-off heroics, the thing to buy.
Meritus sources floating platform structures and mooring components from Chinese yards, with inspection designed around repeatability across a series rather than acceptance of a single unit.
Semi-submersible floater hulls, columns and pontoons; spar and barge-type floater structures; tower interface and transition structures; mooring components including chain, connectors, fairleads and padeyes; anchor structures including drag-embedment, suction and driven pile types; ballast systems and internal outfitting.
For a series, the risk is drift — unit five quietly differing from unit one. We compare dimensional and weld records across units rather than assessing each in isolation, so a slow deviation in a jig, a procedure or a crew shows up as a trend while it is still correctable.
Floater weight and centre of gravity feed directly into stability and mooring design, so weighing results are a design input rather than a record. We witness weighing and reconcile against the design basis, and verify mooring component certification and proof-load records against the mooring analysis. Every order runs through the same quality chain: shop pre-qualification, material traceability against mill certificates, in-process and final inspection, and a documentation pack released before shipment.
Quality drift across a series — unit five differing from unit one because a jig moved or a crew changed. Weighing performed without temporary steel and preservation accounted for. Mooring component proof-load certificates covering a batch that does not include the delivered items. And watertight compartment testing performed before final penetrations were made.
Enquiry and specification review; shop shortlisting against the actual scope rather than a general vendor list; quotation with the inspection plan priced in, not added later; kick-off with agreed hold and witness points; in-process inspection at those points; final inspection, document pack release and shipment; arrival support if anything is queried. For series production we compare records across units rather than assessing each in isolation, so drift is caught as a trend rather than as a failure.
Because the economic case rests on serial production. The objective is repeatable quality across many units, not an exceptional single unit, so the controls are built around detecting drift.
Semi-submersible hulls with columns and pontoons, spar structures, and barge-type floaters, plus tower interface and transition structures.
Chain, connectors, fairleads and padeyes, and anchor structures including drag-embedment, suction and driven pile types, with certification and proof-load records verified against the mooring analysis.
Because floater weight and centre of gravity feed directly into stability and mooring design. A weighing result that is treated as a record rather than a verification can invalidate the analysis.