
Target tees with integral clamp-type hub ends for erosion protection at flowline direction changes. A duplex tee body and blind hub contain replaceable sacrificial cushion material, with metal seal ring and clamp set.
Target tees with integral clamp-type hub ends for erosion protection at flowline direction changes. A duplex tee body and blind hub contain replaceable sacrificial cushion material, with metal seal ring and clamp set. Meritus Technology is a supplier in China and sourcing partner for pressure-containing oil & gas production piping equipment. Standards: ASME VIII, API 6A, NACE MR0175 / ISO 15156. Confirm design code, material, pressure–temperature envelope, fluid composition, corrosion/erosion allowance and connection interfaces before manufacture. Approval and registration status relates to the relevant manufacturing partner, product scope and purchasing entity; project-specific evidence and current validity are confirmed at quotation. These references do not imply that every product is approved by every listed organization or that Meritus holds direct approvals.
Supplied through oil-operator-approved manufacturing partners — vendor registrations include Aramco, ADNOC, PTTEP, ONGC, Chevron, Shell, TotalEnergies; EPC approvals include EIL, L&T, TechnipFMC, KBR (full list on the category page). Approvals & Client Base
Warranty: As agreed in the quotation and contract
Service Life: Depends on duty, environment and maintenance
Maintenance: Based on service conditions, inspection findings and the equipment-specific maintenance procedure
Supplied through oil-operator-approved manufacturing partners — vendor registrations include Aramco, ADNOC, PTTEP, ONGC, Chevron, Shell, TotalEnergies; EPC approvals include EIL, L&T, TechnipFMC, KBR (full list on the category page). Approvals & Client Base
Review approved drawings, pressure–temperature ratings, fluid compatibility, inspection records and site permits. Isolate, depressurize, drain and verify zero stored energy before opening any pressure boundary.
Certified lifting equipment, calibrated torque tools and project-approved alignment and pressure-test equipment.
Never loosen a connector or open a closure under pressure. Follow isolation, depressurization, gas testing and permit-to-work procedures.
Quotation-stage review of service conditions, drawings, codes, materials and manufacturing-partner approval requirements.
Installation-support scope and site attendance agreed in the purchase order.
Equipment-specific handling, closure, screen/cushion replacement and maintenance guidance as applicable.
Approved drawings, material certificates, weld traceability, NDT, pressure-test reports and project-specific approval evidence as ordered.